English Menu

קבע כעמוד הבית

הוסף אתר למועדפים

המליצו לחברים

ניוזלטר

חשיפה באתר

אודות האתר

פרסום באתר

יצירת קשר

 
  לוח המודעות   מערכת הפורומים   מדור לימודים וקורסים   Archifind - אינדקס אנשי מקצוע   מדריך חברות ומוצרים
 

Archijob Studio

טיפ אוטוקאד

עיצוב פנים

מאמרים

תחרויות ICN

בלוג

סקר שכר

חשיפת פרוייקטים

ראיונות

חדשות וארועים

ארכיג'וב ראשי

 

רשימת התחרויות

Competitions List

ארכיון תחרויות ישנות

Archive of former Competitions

רשימת האתרים השותפים ב ICN

List of ICN partners

red hook: the bicycle master plan design competition
the forum for urban design

Type:

Open

Registration Deadline:

02/06/2008

Submission Deadline:

31/07/2008

Open to:

All

Entry Fee:

US $50 Individuals, $100 Teams and Students are Free

Awards:

us $4,000 first prize; 4 runners-up: $1,000; crowd favorite: $500

Jury:

alexandros washburn, philip nobel, vishaan chakrabarti and andrea andrea white, jonathan marvel, judith kunoff, ryan russo and aaron naparstek

located in the southeast corner of brooklyn, red hook is the only neighborhood close to manhattan that is underserved by public transportation. one train station at smith/9th streets in nearby carroll gardens is a mile from the heart of red hook, which is otherwise served by two bus lines and a water taxi that goes to wall street [but only in the summer months]. because transportation options are limited, red hook residents are unable to conveniently connect to the city around them and as a result, the neighborhood itself has experienced sporadic economic development.

the forum for urban design is launching a design competition to re-imagine red hook as the most bicycle friendly neighborhood in all of new york. not only could bicycling become the predominant method of transportation for neighborhood residents, it could become a destination for urban cyclists and foster sustainable development.

the design competition has three components: one emphasizing architecture, the second emphasizing urban planning and design, and the third emphasizing feasibility [i.e. funding sources]. 1. retrofitting a bike garage [or ?loft?] at the smith/9th street station, and 2. connecting this elevated train stop to the rest of the neighborhood via dedicated bike lanes and other bike amenities, 3. identifying funding sources such as the reauthorization of federal surface transportation legislation, foundations, and commercial sponsors.

the immediate goal of this project is to make red hook more accessible for local commuters and safer for local recreational cyclists; however, the greater vision is to spur sustainable economic development by attracting cyclists from around new york city to enjoy the red hook waterfront and other neighborhood treasures. additionally, by focusing on the smith/9th street station, we hope to encourage mta to think about how they can rehabilitate it in a way that facilitates other methods of transportation.
competition web site : http://www.forumforurbandesign.org/bikecomp.html
email competition : [email protected]

רשימת התחרויות

Competitions List

ארכיון תחרויות ישנות

Archive of former Competitions

רשימת האתרים השותפים ב ICN

List of ICN partners


 

כל הזכויות שמורות - איתי אלמוג, אדריכל-יוצר האתר
All rights reserved - Itay Almog, Architect-Site creator
© 2000-2007 [www.Archijob.co.il, www.Archijob.com, www.Archijob.biz]
האתר מנוהל באמצעות ארכיג'וב עסקים בע"מ
Archijob Business ltd operates the Archijob website

[email protected]
03-7467780
+972-3-7467780